Custom Basement Walk-Out Additions & Foundation Excavation




Surgically cutting separate grade-level entrances into Toronto foundations to create legal income suites, bright garden extensions, and secure backyard access.

The Core Strategy
Engineering Safe, Separate Below-Grade Structural Entrances
Cutting a secondary entrance into an existing basement requires a level of engineering mastery that basic renovation crews cannot provide. You are physically breaking into your home’s main load-bearing envelope, sawing through reinforced foundation walls, and excavating tons of earth right next to your home's structural footprint.
At Procon General Contractors, we specialize in the comprehensive excavation, structural saw-cutting, and drainage engineering required for premium basement walk-outs. We handle the entire design-build process—from structural engineering reviews to complex municipal drainage compliance. Because our owner Frank stays on your job site every single morning, we ensure your foundation walls are shored up safely and your new entrance is entirely weatherproof.
How We Build Your Separate Entrance
To deliver a flawless, leak-proof basement walk-out that passes city building inspections, your project moves through five highly coordinated phases:
1. Shoring, Weight Redistribution & Engineering
The Process: Before a single centimeter of concrete is altered, we secure the structural integrity of your home. We calculate the structural weight loads and install heavy-duty temporary shoring posts to support the upper levels.
The Technical Edge: We surgically install an engineered steel lintel or a reinforced concrete header above the target zone to permanently redistribute the home's weight before cutting.
2. Precision Diamond Saw-Cutting
The Process: We utilize heavy-duty, water-cooled diamond-blade concrete saws to cut cleanly through 8 to 12 inches of poured concrete or reinforced concrete block foundation walls.
The Technical Edge: This hydraulic equipment allows us to make millimeter-precise cuts for your new exterior door frame without sending damaging shockwaves or cracks through your remaining foundation wall.
3. Deep Excavation & Poured Retaining Walls
The Process: We excavate the earth right outside your foundation wall down to the depth of your lower concrete slab footprint. Depending on your property layout and backyard clearance, we utilize a mini-excavator or manage a controlled, meticulous hand-digging sequence.
The Technical Edge: To permanently hold back the extreme pressure of the surrounding soil, we tie steel rebar matrix lines into your foundation and cast thick, reinforced concrete retaining walls or heavy-duty block structures.
4. Advanced Sub-Grade Drainage Engineering
The Process: A basement walk-out acts like a funnel for rainwater if it is not engineered properly. We connect a heavy-duty, commercial-grade floor drain right at the base of your outdoor landing stairs.
The Technical Edge: We tie this drain directly into your home's main internal storm sewer or run an independent deep-sump pump line to guarantee that heavy Toronto rainstorms or melting winter snow lines can never pool or flood your basement entry.
5. Framing, Thermal Protection & Finishes
The Process: We frame out the structural opening with premium, pressure-treated structural lumber and install an insulated, code-compliant exterior door system complete with heavy-duty weatherstripping.
The Technical Edge: We finish the enclosure with code-mandated top and side steel safety railings, clear step lighting, and beautiful natural stone or clean concrete masonry transitions.
🏗️ One Project at a Time. Frank On-Site Every Morning.
Dropping a foundation wall and excavating tons of soil creates a massive liability if the job site is left abandoned. Many contractors juggle multiple projects, leaving your home exposed to weather and settling risks for weeks. Procon is different.
We focus on exactly one major project at a time. Our owner, Frank, is physically on your job site every single morning. He personally monitors the excavation, oversees the engineered steel lintel installation, and inspects the sub-grade drainage lines to ensure absolute structural safety and zero construction delays.
Fixed-Price Structural Walk-Out Investments
We deliver comprehensive, itemized, fixed-price contracts so you face zero surprise budget updates mid-construction.
Project Scope Target Investment Range Core Engineering Work Included
Structural Concrete Walk-Out Entrance $28,000 – $48,000+ Engineered steel lintel installation, foundation saw- cutting, soil excavation (hand-dug or mini-excavator), reinforced poured concrete or block retaining walls, integrated sub-grade floor drain, safety perimeter railings, and insulated exterior door system.
Licensed. Insured. Fully Compliant.
ESA Certified Electrical Work: Every wire pulled, exterior step light wired, and backup pump system installed for your walk-out is executed by a licensed Ontario Master Electrician and logged directly with the Electrical Safety Authority (ESA).
$2M Liability & WSIB Clearance: Your property is fully protected. We carry comprehensive 2-million-dollar commercial liability insurance and maintain perfect standing with the Workplace Safety and Insurance Board (WSIB).
Red Seal Drainage Experts: Sub-grade floor drains require exact municipal tie-ins. All subterranean drainage and weeping tile routing is managed by licensed Ontario tradesmen who understand proper backflow and slope metrics.
Basement Walk-Out Additions: Frequently Asked Questions
Q: Do I need a building permit for a basement walk-out in Toronto?
A: Yes, absolutely. Under the Ontario Building Code (OBC), cutting an opening into a foundation wall is a major structural alteration. You legally require BCIN-licensed architectural drawings, structural engineering load calculations, and an approved City of Toronto or Etobicoke Building Permit. Procon manages this entire engineering and municipal application process for you from start to finish.
Q: How do you prevent a basement walk-out from flooding during heavy Toronto rainstorms?
A: We use a multi-layered drainage system. We excavate a deep sump pit at the base of the outdoor landing and install a commercial-grade, heavy-duty floor drain. This drain is tied directly into your home’s internal storm sewer system or routed to an automatic, high-capacity sump pump with a battery backup. We also build a raised concrete lip at the top of the stairs to prevent surface yard water from cascading down into the well.
Q: Can you cut a walk-out entrance if my basement has a low ceiling or requires underpinning?
A: Yes. In fact, if you have a low, historic 6-foot basement footprint, combining a walk-out entrance with our structural underpinning and foundation lowering service is the ideal configuration. We can lower the entire foundation to achieve 8-foot or 9-foot clear ceilings, and then surgically cut the walk-out door to match your brand-new, deeper floor level seamlessly.
Q: How deep do the concrete retaining walls for the outdoor stairs need to be?
A: In Ontario, the structural footings for your outdoor walk-out retaining walls must be poured below the local frost line—which means digging down at least 4 feet (1.2 meters) below grade. This prevents the freezing winter ground from expanding, shifting, or pushing against the retaining walls, ensuring your outdoor concrete staircase never cracks or pulls away from the house.
Q: What is the typical timeline to build a custom basement walk-out addition?
A: The physical construction phase—including temporary structural shoring, heavy excavation, diamond saw-cutting, pouring the reinforced concrete retaining walls, and setting up the sub-grade drainage—typically takes 2 to 3 weeks. Because Procon strictly enforces a "one project at a time" guarantee, Frank is on your job site every single morning to keep the heavy machinery and concrete pours moving safely without any scheduling delays.
Ready to Cut a Safe, Legal Entrance Into Your Toronto Basement?
Don't risk your home's structural safety or invite flooding issues with unlicensed contractors. Work with an experienced, licensed general contracting team that manages the entire engineering, excavation, and structural building process from start to finish.
Contact Paths
Location: 39 Hawkedon Crescent, Etobicoke, ON M9W 3L6
"Procon General Contractors is an owner-operated renovation company operating out of Etobicoke, ON. Proudly serving Toronto, The Kingsway, High Park, The Annex, North York and the surrounding GTA since 1990."
